Solargy Construction

Civil Post-Tension Solutions Projects

Join us on our journey as we continue to transform the construction landscape with our expertise and unwavering commitment to excellence.

project icon

Marrasem – New Administrative Capital-R5

Bonded post-tension system was applied in both directions.

Marrasem – New Administrative Capital-R5

Bonded post-tension system was applied in both directions.

Total Post tension cables : 3000 tons

Duration of the project : 24 months

Review →
project icon

Marrasem – Medical Complex –Suez

Bonded Post-tensioning system was applied in both directions.

Marrasem – Medical Complex –Suez

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 395 tons

Duration of the project : 6 months

Review →
project icon

CPM precast factory – Palm Hills –Giza

140 Villas - precast Slabs

CPM precast factory – Palm Hills –Giza

140 Villas - precast Slabs

Total Post tension cables : 100 tons

Duration of the project : 4 months

Review →
project icon

IC Group – The Office Mall – New Administrative

Bonded Post-tensioning system was applied in both directions.

IC Group – The Office Mall – New Administrative

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 142 tons

Duration of the project : 6 months

Review →
project icon

IC Group – Gold Mall – New Administrative

Bonded Post-tensioning system was applied in both directions.

IC Group – Gold Mall – New Administrative

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 1440 tons

Duration of the project : 6 months

Review →
project icon

Alexandria Construction Company - Talaat Mustafa – Mehwar El

Bonded Multi strand system for 24 pre-Cast beams.

Sadaat Bridge

Bonded Multi strand system for 24 pre-Cast beams.

Total Post tension cables : 63 tons

Duration of the project : 1 month

project icon

Farag Amer Group - Santorini El Alamein

Bonded Post-tensioning system was applied in both directions.

Farag Amer Group - Santorini El Alamein

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 430 tons

Duration of the project : 12 months

Review →
project icon

Marrasem – Fifth Square Mall –New Cairo

Bonded Post-tensioning system was applied in both directions.

Marrasem – Fifth Square Mall –New Cairo

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 1600 tons

Duration of the project : 14 months

Review →
project icon

Pharmarad – Plasma Collection Center

Bonded Post-tensioning system was applied in both directions.

Pharmarad – Plasma Collection Center

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 30 tons

Duration of the project : 1 month

project icon

كوبري تقاطع طريق الأبيض مع وصلة محور 26 يوليو

Bonded Multi strand system for 10 pre-Cast beams.

كوبري تقاطع طريق الأبيض مع وصلة محور 26 يوليو

Bonded Multi strand system for 10 pre-Cast beams.

Total Post tension cables : 12 tons

Duration of the project : 15 days

Review →
project icon

Affix Mall – New Cairo

Bonded Post-tensioning system was applied in both directions.

Affix Mall – New Cairo

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 120 tons

Duration of the project : 8 months

Review →
project icon

Jaya Mall – New Capital

Bonded Post-tensioning system was applied in both directions.

Jaya Mall – New Capital

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 80 tons

Duration of the project : 6 months

Review →
project icon

Solidier Mall – New Capital

Bonded Post-tensioning system was applied in both directions.

Solidier Mall – New Capital

Bonded Post-tensioning system was applied in both directions.

Total Post tension cables : 80 tons

Duration of the project : 6 months

Review →
project icon

كوبرى تقاطع الوصلة العامودية مع طريق ناهيا

Bonded Multi strand system for 39 pre-Cast beams.

كوبرى تقاطع الوصلة العامودية مع طريق ناهيا

Bonded Multi strand system for 39 pre-Cast beams.

Total Post tension cables : 110 tons

Duration of the project : 30 days

Review →
project icon

كوبرى الأهرام

Bonded Multi strand system for 8 pre-Cast beams.

كوبرى الأهرام

Bonded Multi strand system for 8 pre-Cast beams.

Total Post tension cables : 18 tons

Duration of the project : 10 days

Review →
project icon

It -Upwide-New Cairo

Bonded post-tensioning system was applied in both directions.

It -Upwide-New Cairo

Bonded post-tensioning system was applied in both directions.

Total Post tension cables : 90 tons

Duration of the project : 12 months

Review →
project icon

مشروع كوبرى حسب الله الكفراوى

Bonded Multi strand system for two Cast In situ frames.

مشروع كوبرى حسب الله الكفراوى

Bonded Multi strand system for two Cast In situ frames.

Total Post tension cables : 16 tons

Duration of the project : 20 days

Review →