Smart Village Buildings C2

25000sqm of flat slab 6 floors. Bonded post-tensioning system was applied in both directions.

Smart Village Buildings C2

25000sqm of flat slab 6 floors. Bonded post-tensioning system was applied in both directions.

Total Post tension cables : 150 tons

Duration of the project : 5 months

project icon

Dammietta LNG Tanks

2 Circular tanks, diameter 65 m. Bonded post-tensioning system was applied in circular and vertical directions. Our team's responsibilities included threading, stressing and grouting, along with shop drawing, quality control and check list for civil work.

Dammietta LNG Tanks

2 Circular tanks, diameter 65 m. Bonded post-tensioning system was applied in circular and vertical directions. Our team's responsibilities included threading, stressing and grouting, along with shop drawing, quality control and check list for civil work.

Total Post tension cables : 1200 tons

Duration of the project : 7 months

project icon

Jetty Dammietta

24 post tension pre-cast beams.

Jetty Dammietta

24 post tension pre-cast beams.

project icon

Smart Village Buildings A7

10000 sqm of flat slab 6 floors. Bonded post-tensioning system was applied in one direction.

Smart Village Buildings A7

10000 sqm of flat slab 6 floors. Bonded post-tensioning system was applied in one direction.

Total Post tension cables : 50 tons

Duration of the project : 4 months

Review →
project icon

Smart Village Buildings B115

14000 sqm of flat slab 5 floors. Bonded post-tensioning system was applied in both directions.

Smart Village Buildings B115

14000 sqm of flat slab 5 floors. Bonded post-tensioning system was applied in both directions.

Total Post tension cables : 70 tons

Duration of the project : 3 months

project icon

Raya Holding Building

15000 sqm of post beam 7 floors, total 210 beams.

Raya Holding Building

15000 sqm of post beam 7 floors, total 210 beams.

Total Post tension cables : 75 tons

Duration of the project : 4 months

project icon

Ashmoon Hospital

2000 sqm of flat slab 3 floors. Bonded post-tension system was applied in both directions.

Ashmoon Hospital

2000 sqm of flat slab 3 floors. Bonded post-tension system was applied in both directions.

Total Post tension cables : 20 tons

Duration of the project : 2 months

project icon

Kafr El Zayat Hospital

2000 sqm of flat slab 3 floors. Bonded post-tension system was applied in both directions.

Kafr El Zayat Hospital

2000 sqm of flat slab 3 floors. Bonded post-tension system was applied in both directions.

Total Post tension cables : 20 tons

Duration of the project : 2 months

project icon

Four Seasons Hotel

Bonded post-tension beams for the swimming Pool.

Four Seasons Hotel

Bonded post-tension beams for the swimming Pool.

Total Post tension cables : 20 tons

Duration of the project : 1 months

project icon

Sadat Wood Factory

6 post tension pre-cast beams, 26 m span

Sadat Wood Factory

6 post tension pre-cast beams, 26 m span

project icon

Arzew-Algeria-LNG/LPG Tanks

Post-tension work for two LNG, one butane and one propane storage tank.

Arzew-Algeria-LNG/LPG Tanks

Post-tension work for two LNG, one butane and one propane storage tank.

Total Post tension cables : 20 tons

Duration of the project : 2 months