Marrasem – New Administrative Capital-R5.
Bonded Post-tensioning system was applied in both directions. Total Post tension cables 3000 tons. Duration of the project is 24 months.
Contact US
Let's Call You Back
Bonded Post-tensioning system was applied in both directions. Total Post tension cables 3000 tons. Duration of the project is 24 months.
Let's Call You Back