Farag Amer Group
Santorini El Alamein
Bonded Post-tensioning system was applied in both directions. Total Post tension cables 430 tons. For first Phase - Duration of the project is 12 months (under construction)
Contact US
Let's Call You Back
Santorini El Alamein
Bonded Post-tensioning system was applied in both directions. Total Post tension cables 430 tons. For first Phase - Duration of the project is 12 months (under construction)
Let's Call You Back