project-sheraton.jpg
project-sheraton2.jpg
Sheraton
  • Project Location

    Sheraton , Cairo

  • Project Capacity

    3.8 kWp

  • Battery Size

    28.8 kWh

  • Energy Produced

    5.02 MWh/year

  • Annual Reduction in CO₂
    emissions (0.579 ton/kWh)

    2,906 Ton/year